South Hedland Foot Bridge Repair and Replacement
Bridge railing repair and replacement with galvanized flat bar to achieve a more robust design at the South Hedland foot bridge
Port Hedland Jetty Refurbishment
Hand railing and ladder refurbishment/replacement of rusted components at the Port Hedland Jetty
Port Hedland Tidal Pump Facility – Fabrication and Installation
Design and installation of flood gate winches to achieve the client’s safety and manual handling requirements at the Port Hedland tidal pump facility.
Fabrication and installation of new flooring, hand rails and access ladders, at the Port Hedland tidal flood pump facility.
Cemetery Beach – Stainless Steel Railing
Consultation, Fabrication and installation of Stainless Steel railing at the Cemetery beach look out.
De Grey River Rail Bridge – BHP Billiton
Repair of significant cyclone damage in situ welding of new pile replacement sections & installation of the new head stocks.
P & H Face Shovel Refurbishment – P & H
Full refurbishment of two used P & H face shovels prior to export shipment to Indonesia including major repairs.
Maintenance of Crushing Plant – Consolidated Minerals
Repairs, maintenance & Project development upgrades to material handling, primary & secondary crushing facilities at the Woodie Woodie Mine for the past two years.
Commissioning of Concrete Sleeper Plant – Austrak
Commissioning of a concrete railway sleeper manufacturing plant. This project involved design, development, manufacture & installation of task specific process components required to make the plant operational.
MPD JV – BHP Billiton
Commissioning of areas of the PACE & RGP 1 projects including punch list items. Miscellaneous works on the RGP 2 & RGP 3 projects including structural modifications, Pipework, signage & fencing
Car Dumper 4 – Theiss
The construction of Ore Car Dumper No. 4 at Finucane Island, including modifications to the fixed plant. Demolition work.